★★★★★ 4.8 Google Reviews   |   ✓ Direct Lender Since 1998   |   ✓ No Upfront Fees   |   ✓ 48-Hour Approvals   |   ✓ All Credit Welcome

Start here — get your terms in writing

One page, about five minutes. Tell us the deal and we come back with real numbers, not a rate range. No SSN and no credit pull to get a quote.

  • ✓ Direct lender since 1998
  • ✓ No upfront fees
  • ✓ Close in 7–21 days
Get My Written Quote → Or call 877-895-3634

Mon–Thu 9–5 · Fri 9–12 CT

No credit pull · no sales pitch · your choice

Do the whole thing online, or talk to a person. Whichever you prefer.

Keep it online →
Send us the deal, get terms back in writing. We never pull your credit to quote — no inquiry, no score impact. Tick “email only” and we will not call you either. Nothing to lose by asking.
✆ Talk to a person →
877-895-3634 — a lender, not a call centre. Ask a question without filling anything in. Mon–Thu 9–5 · Fri 9–12 CT.

Texas Construction Loans — Current Terms

30 years
Lending in Texas

12–18 months
Term

$200,000
Minimum loan

7–21 days
Typical close

Very high LTVs
Leverage

We have been lending on Texas construction for 30 years. You
do not stay in this business that long by being the expensive option — and we
would rather quote your actual project than advertise a headline rate you turn
out not to qualify for. Your number depends on leverage, builder experience, and
whether the exit is a sale or a refinance, so we price the deal in front of us.
Interest-only during construction, funded by draw against inspection.
No upfront fees, and nothing to pay before you have terms in writing.

Construction Loans – Texas Commercial Loans

A construction loan is short-term real estate financing — usually up to three years — secured by a mortgage on the property being built or renovated. It covers land development and building construction costs, disbursed in stages: as needed, as each phase is completed, on a prearranged draw schedule, or when a specific condition (like foundation completion or framing) is met.

How Construction Loan Draws Work

Rather than funding the full loan amount up front, construction loans release money in stages tied to verified progress — protecting both the lender and the borrower from paying interest on undisbursed funds. A typical draw schedule follows major construction milestones: site work and foundation, framing, mechanical/electrical/plumbing rough-in, and finish-out, with an inspection at each stage before the next draw releases.

Construction-to-Permanent Financing

Construction loans are typically paid off from the proceeds of permanent financing — usually structured over 20 to 30 years — which is itself repaid from the cash flow generated by the completed, leased-up building. That permanent take-out financing is generally arranged and approved before the construction loan is disbursed, so there’s a clear exit plan in place from day one. Also called a building loan, construction mortgage, or development loan.

What We Finance

Start your construction loan: 877-TX-LENDING (877-895-3634)

Service Areas: Houston | Dallas | Austin | San Antonio | Fort Worth | Near Me TX Construction Rates
Common Questions: Credit Score Required | How Long to Close | Hard Money vs DSCR | Bad Credit OK | DSCR Requirements | No Income Verification | Minimum Down Payment | Documents Required
✆ Call 877-895-3634 📄 Free Quote
New Construction

Commercial Construction Loans in Texas:
Ground-Up Financing That Moves

Commercial construction loans fund the build, not the finished product. Understanding how they're structured — draws, inspections, interest reserves — tells you what to expect from Day 1 through certificate of occupancy.

🏗️Ground-Up Construction

Funds horizontal development and vertical construction on raw or entitled land. The most complex construction loan type — requires complete plans, permits, cost breakdown, and contractor vetting. Interest paid on drawn balance only.

Loan-to-CostVery high LTVs
Loan-to-ARVMax 65% of completion value
Term12–24 months
InterestOn drawn balance (IO)
ExitPerm loan, sale, or CMBS refi

🔨Gut Rehab / Major Renovation

Existing structure being taken down to studs — new MEP, new interior, potentially new exterior skin. Treated like construction by most lenders. Requires full scope of work, licensed GC, and draw schedule aligned to renovation phases.

Loan-to-CostVery high LTVs
Max ARV loan65–70% of ARV
Term12–18 months
Draws3–5 per project
InspectionThird-party per draw

🏢Build-to-Suit

Construction of a commercial building pre-leased to a specific tenant. The lease agreement reduces lender risk significantly — a credit tenant lease is essentially collateral, so build-to-suit supports our highest leverage. Office, industrial, and healthcare are common BTS property types in Texas.

Loan-to-CostUp to 80% (with credit tenant)
Term12–24 months construction
ExitPermanent NNN loan or sale
Rate advantageOften 0.5–1% lower rate

🏘️Horizontal / Land Development

Raw land development — utility infrastructure, roads, pads. Highest risk construction category. Lenders look closely at entitlement status, absorption projections, and developer experience. Typically requires 30–35% equity with proceeds released in phases as lots sell or infrastructure milestones are reached.

Loan-to-CostVery high LTVs
Equity required30–40%
Term18–36 months
PrerequisiteEntitlement in hand preferred

How Construction Draw Schedules Work

The full loan amount isn't disbursed at closing — it's released in stages as verified construction milestones are completed. Here's a typical 5-draw commercial construction loan:

Draw 1
10%

Foundation & Mobilization

Released at loan close after land acquisition confirmed. Covers site prep, utility rough-ins, and foundation work.

Footings poured and inspected · Utility connections started · GC mobilized on site
Draw 2
25%

Framing Complete

Largest draw — framing is the most material-intensive phase. Structural inspections required before release.

Framing passed inspection · Roof deck installed · Windows and exterior doors rough-in
Draw 3
25%

Rough MEP Inspections

Mechanical, electrical, and plumbing rough-ins complete — the work that lives inside the walls before drywall goes up. Must pass city inspection.

Electrical rough-in passed · Plumbing rough-in passed · HVAC ductwork complete
Draw 4
25%

Drywall & Interior Finishes

Drywall hung and finished, interior finishes in progress. Exterior complete. Lender inspection confirms progress matches disbursement.

Drywall complete and taped · Exterior paint/finish done · Flooring in progress
Draw 5
15%

Certificate of Occupancy

Final draw released upon receipt of Certificate of Occupancy from the city. Building is complete, punch-list done, ready for occupancy or lease-up.

CO issued by city · Final inspections passed · Lien waivers from all subs collected

Construction Loan Qualifies If:

Borrower has prior development or construction experience
Licensed, bonded general contractor with commercial project history
Complete construction plans, permits in hand or in review
Detailed cost breakdown with contractor bids for major trades
Realistic completed value supported by market comps or pre-lease
Borrower equity of 25–35% or strong land position
Clear exit strategy: permanent loan, sale, or lease-up with known tenant

Construction Loan Won't Work If:

No entitlements or permits — lenders won't fund speculative pre-approval
No licensed GC — owner-builder commercial loans are extremely rare
Construction budget unsupported by contractor bids ("I'll figure it out")
No equity — 100% LTC deals are essentially unavailable outside equity JV structures
Unrealistic completion timeline (bank requires completion reserves for overruns)
No clear take-out plan — lenders won't fund if exit is unknown
Very high
Max LTC
Of total project cost; less for land-heavy deals — call for your number
Very high
Max LTV (ARV)
Based on completed appraised value — call for your number
24 mo
Max Term
12-24 months typical; complex projects to 36
IO
Payment Type
Interest-only on drawn balance during construction
$200K
Min Loan
Minimum loan amount — $200K across all programs

Shovel-Ready or Planning Stage — We Want to Hear About It

Submit your project summary: property address, plans status, total project cost estimate, and your contractor. We'll tell you where you stand and what the financing looks like within 24 hours.

Submit Your Construction Project →
Loan Type Guide

5 Types of Texas Commercial Loans —
Which One Do You Need?

Bridge, hard money, construction, permanent, SBA — each serves a different purpose at a different cost. Here's how they compare so you can match the right loan to your deal.

1
Bridge Loan

Bridge Financing

Short-term gap financing, 6–36 months
RateQuoted on your deal
Term6–36 months
Max LTV75–80%
AmortizationInterest-only
Close Time2–4 weeks

Used to bridge from one state to another: buy before you sell, buy a property that needs stabilization before a permanent loan, or fund a value-add project before a conventional refinance. Lower rate than hard money, slightly slower close.

2
Hard Money

Hard Money Loan

Asset-based, fast close, distressed properties
RateQuoted on your deal
Term6–18 months
Max LTV75–85% of purchase
AmortizationInterest-only
Close Time7–14 days

The fastest close, highest rate. Used for fix-and-flip, auction purchases, and distressed acquisitions that can't qualify for bridge or conventional. Property condition is irrelevant — we lend on ARV and equity.

3
Construction

Construction Loan

New builds and major rehabs, draw-based
RateQuoted on your deal
Term12–24 months
Max LTC75–80% of cost
AmortizationDraw schedule (IO)
Close Time3–5 weeks

Funds released in draws as construction milestones are met — not upfront. Interest only on drawn amount. Converts to permanent loan or is paid off upon completion. Requires approved plans, permits, and a licensed GC.

4
Permanent / DSCR

Permanent Loan

Long-term hold, income-producing property
RateQuoted on your deal
Term5–30 years
Max LTV75–80%
Amortization25–30 years
Close Time2–4 weeks

The long-game loan: stabilized rental income qualifies the loan, not your personal W-2. DSCR loans have no property count limit, work for LLCs, and close faster than conventional. Used for buy-and-hold investors who want predictable 30-year payments.

5
SBA

SBA 7(a) / 504

Owner-occupied business real estate, low down
RateQuoted on your deal
Term10–25 years
Down Payment10–15%
AmortizationFully amortizing
Close Time45–90 days

Only for businesses that owner-occupy the property (51%+ for 7(a), 51%+ for 504). Lowest down payment available. Slowest close. SBA 504 splits the loan between a bank (50%) and SBA CDC (40%) — best fixed-rate option for qualifying businesses.

Loan Sequencing by Deal Type

Most deals use multiple loan types in sequence. Here's how experienced Texas investors stack them:

Fix & Flip (In-and-Out)
Hard Money (acquire)→Hard Money (carry rehab)→Payoff at sale
BRRRR — Buy, Rehab, Rent, Refi, Repeat
Hard Money (acquire)→Stabilize + rent→DSCR Permanent (30yr)
Ground-Up Construction → Hold
Construction Loan→Lease-up period→Permanent / DSCR
Value-Add Multifamily Acquisition
Bridge Loan (acquire + rehab)→DSCR at stabilized value (pull equity)
Owner-Occupied Business Property
SBA 504 or 7(a)→Hold + business growth

Not Sure Which Loan Type Fits Your Deal?

Describe your project and we will tell you which structure makes the most sense — and issue a term sheet within 24 hours if it's fundable.

Submit Your Deal →
Modular & Container Building Financing

Modular & Container-Based Building Financing:
When Off-Site Construction Changes the Underwriting

Modular (factory-built, permanently installed) and container-based structures have moved well past temporary job-site trailers into real permanent commercial use — retail pop-ups, restaurant and coffee-kiosk buildouts, offices, self-storage add-ons, and workforce housing. The construction method changes how a lender looks at draws, appraisal comps, and permanent-loan takeout, and that's exactly where we start.

Off-Site Build
Most Value Created Before Installation
Draw Schedule
Structured Around Factory + Site Milestones
Permanent Foundation
Required for Real-Property Treatment
Varies
By Use, Jurisdiction & Modular Vendor

The core underwriting question is whether the structure is permanently affixed real property (foundation, utility hookups, no wheels or removable chassis) or something closer to personal property that happens to sit on a commercial site. Permanently installed modular buildings on owned or long-leased land underwrite like conventional commercial real estate; anything closer to a movable, non-permanent installation gets evaluated very differently.

What We Look At

Modular Retail & Restaurant

Factory-built retail pads, coffee kiosks, and quick-service restaurant buildings

Modular Office & Workforce Housing

Permanently installed office space and multi-unit workforce/crew housing

Container-Based Commercial Space

Shipping-container retail, storage, and mixed-use buildouts on a permanent slab

Modular Additions to Existing Sites

Self-storage offices, ancillary buildings, and expansions added to an existing property

Financeable Profile

Permanent foundation, code-approved utility hookups, and local building department sign-off
Established modular fabricator with a track record and clear factory-to-site draw milestones
Land owned or under a long-term lease, with the structure treated as real property, not personal property
Comparable sales or lease data supporting value for the finished, installed structure

Needs Closer Underwriting

Structure retains a removable chassis, wheels, or is not permanently affixed to the land
First-time or unproven modular fabricator with no completed comparable projects
Thin local comps for a finished modular or container building in that specific use and market
Draw structure that releases most funds before factory completion is verified

Why the Draw Schedule Looks Different

With site-built construction, value accrues in place, in front of the lender, as the building goes up. With modular and container construction, a large share of value is created off-site at a factory before anything is ever delivered — so draws typically split between factory-progress payments (often milestone- and inspection-verified) and a smaller site-work/installation tranche. We structure financing around that split rather than forcing a standard site-built draw schedule onto an off-site build.

Financing a Modular or Container-Based Building?

Tell us about the build method, fabricator, and installation site. We'll structure financing around how the value is actually being created.

Submit Your Loan Request →
Commercial loans by city — all 199 locations →
📞 Free Quote — 877-TX-LENDING (877-895-3634)